Monday, August 4, 2014

Day 18

plastic down. inspection, passed. ready for the slab!
 


the raised frame is for a little step up for our shower.



saving holes for our floor drains


raised step up for the tub in the second bathroom



the dirt cut outs are for our reception cells, they will be dug down and filled with rocks.  this is will collect tub, sink and washing machine water and then filter it over to the planters in the front hallway. 






No comments:

Post a Comment