First project - gravel, sand, and dirt in the east berm planter cell. You can't see the dirt, but here is picture of the completed planter on the east berm. It still needs a final coat of cement on the outside of the east wing wall which will smooth everything out.
Second project - completed the gravel in the graywater overflow trench. I dug the trench out two years ago and finally completed the gravel today.
Saturday, May 27, 2017
Monday, May 8, 2017
Planter Cell
In order to complete the berm around the propane tank enclosure we needed to raise the east wing wall; so we decided to build a ferrocement planter out of lathe and rebar.
Sunday, April 30, 2017
East Wing Eaves Cemented
Outside of east wing eaves cemented. Two layers of 6 mil plastic as a vapor barrier, lathe, and cement.
Saturday, March 25, 2017
Graywater Septic - Outdoor Kitchen
Graywater septic for outdoor kitchen - 55 gallon drum with a perforated drain line. Basic septic system which will be more than adequate for the outdoor kitchen graywater runoff.
Saturday, March 11, 2017
Well Line - Outdoor Kitchen
Sunday, March 5, 2017
Trenching
Trenching for outdoor kitchen freshwater line:
The portion inside the well house had to be dug out by hand.
The portion inside the well house had to be dug out by hand.